Feasibility study for Spence Growth option, BHPB

Detailed engineering and construction for Escondida Water Supply, BHPB

Detailed engineering Quebrada Blanca Phase II, Teck

Basic and detailed engineering Collahuasi Phase II, CMDIC

EPC Las Bambas copper concentrator, MMG

Feasibility and EPCM Cerro Casale, CMC, Barrick Gold and Kinross

EPC Antapaccay, Xstrata

Feasibilty Project Quechua, Compañía Minera Quechua, PAN PACIFIC COPPER

Feasibility Lobo Marte, Compañía Minera Lobo Marte

Basic and detailed engineering for Project 320 KPT Cajamarquilla, Votoramtims Metais

Basic and detailed engineering for Project 160 KPT Cajamarquilla, Votoramtims Metais

Feasibilty, basic and detailed engineering for project hypogene, Compañía Minera Carmen de Andacollo, Teck

Basic and detailed engineering crushing plant El Toco for Soquimich

CPR Project, concentrate feasibility study Los Colorados and Laguna Seca for Minera Escondida Ltda.

Basic engineering, tailings copper recovery plant, Minera Escondida Ltda.

Basic engineering tailings dam el Mauro. Minera Los Pelambres

IB Project Gaby – AMEC. Codelco Chile, Chuquicamata division

Basic engineering, replacement sleeves for drying plant FS Nº1. Codelco Teniente

Integral optimization concentrator engineering details tailings thickener. Codelco Chuquicamata

Engineering services for augmenting the capacity of the mining pipeline Collahuasi. CMDIC

Detailed engineering for Electrowinning Project PB. Cía. Carolina de Michilla mine

Basic engineering integral optimization of A-2 concentrator. Codelco Chuquicamata

Complementary basic engineering. PARCM Phase I Project, augmenting flotation time of plant concentrators. Codelco Chuquicamata

Details engineering, Expansion Project Los Bronces 54 Ktpd. Compañía Minera Disputada de Las Condes

Details engineering for intermediate pumping station. Disputada de Las Condes

Details engineering, installation of the second Geho pump. Los Pelambres mine

Basic engineering, Pulp transportation system expansion, Escondida mine

Basic enginering, Potrerillos smelter, Salvador Mine Codelco. Converter development, El Teniente. Development of feeding converter system and slag oven. El Teniente

Basic engineering Potrerillos smelter. Codelco Salvador

Basic engineering, Santa Fe Line 2, CMPC Celulosa

Detail engineering, Pacific Biomass boiler project, CMPC Celulosa

Detail engineering, O2 Deling and Ncg & Ncg Laja, CMPC Celulosa

Conduciton of tailings, Los Peleambre mine

Basic engineering, Peripheral workshop, Chuquicamata South Mine

Detail engineering, handling optimization of Pebbles A2 concentrator

Conceptual engineering, Residual solids landfill, Ind. Plta Pacific 2, Cmpc

Basic engineering, PDA phase I, Andina

Esso Earth moving, maritime terminal Pargua

Devil Regiment Project Phase II, El teniente

Detail engineering, Ffcc Wheel reprofiling – Tte8, El Teniente

Conceptual Engineering, crossing extension of L1 underpass, Metro Manquehue

Basic engineering, Line 1 East, Metro

Detail engineering, interconnections/Junction La Farfana-Mopocho, Aguas Andina

Detail enginering, Pureo Plant Calbuco, X Region, Codelco

Detail engineering, Section 0 Quinta Normal-General Velásquez, Metro Santiago de Chile

Detail engineering, Section 1 Quinta Normal-Lo Prado, Metro Santiago de Chile

Basic engineering, Dock Bridge passing Marino San Vicente Terminal, Enap

Basic engineering, standardization of medium voltage cells, Miraflores and Quinteros, Chilquinta

Detailed land engineering Mauro reservoir, Los Pelambres Mine

Basic engineering, standardizing switchyards 110kv and 12kv S/E San Antonio, Chilquinta

Cmpc Laja and Santa Fe Upgrade

Truck workshop Collahuasi

Pre-feasibility and feasibility Maricunga

BEPCM Rio Elqui