Feasibility study for Spence Growth option, BHPB
Detailed engineering and construction for Escondida Water Supply, BHPB
Detailed engineering Quebrada Blanca Phase II, Teck
Basic and detailed engineering Collahuasi Phase II, CMDIC
EPC Las Bambas copper concentrator, MMG
Feasibility and EPCM Cerro Casale, CMC, Barrick Gold and Kinross
EPC Antapaccay, Xstrata
Feasibilty Project Quechua, Compañía Minera Quechua, PAN PACIFIC COPPER
Feasibility Lobo Marte, Compañía Minera Lobo Marte
Basic and detailed engineering for Project 320 KPT Cajamarquilla, Votoramtims Metais
Basic and detailed engineering for Project 160 KPT Cajamarquilla, Votoramtims Metais
Feasibilty, basic and detailed engineering for project hypogene, Compañía Minera Carmen de Andacollo, Teck
Basic and detailed engineering crushing plant El Toco for Soquimich
CPR Project, concentrate feasibility study Los Colorados and Laguna Seca for Minera Escondida Ltda.
Basic engineering, tailings copper recovery plant, Minera Escondida Ltda.
Basic engineering tailings dam el Mauro. Minera Los Pelambres
IB Project Gaby – AMEC. Codelco Chile, Chuquicamata division
Basic engineering, replacement sleeves for drying plant FS Nº1. Codelco Teniente
Integral optimization concentrator engineering details tailings thickener. Codelco Chuquicamata
Engineering services for augmenting the capacity of the mining pipeline Collahuasi. CMDIC
Detailed engineering for Electrowinning Project PB. Cía. Carolina de Michilla mine
Basic engineering integral optimization of A-2 concentrator. Codelco Chuquicamata
Complementary basic engineering. PARCM Phase I Project, augmenting flotation time of plant concentrators. Codelco Chuquicamata
Details engineering, Expansion Project Los Bronces 54 Ktpd. Compañía Minera Disputada de Las Condes
Details engineering for intermediate pumping station. Disputada de Las Condes
Details engineering, installation of the second Geho pump. Los Pelambres mine
Basic engineering, Pulp transportation system expansion, Escondida mine
Basic enginering, Potrerillos smelter, Salvador Mine Codelco. Converter development, El Teniente. Development of feeding converter system and slag oven. El Teniente
Basic engineering Potrerillos smelter. Codelco Salvador
Basic engineering, Santa Fe Line 2, CMPC Celulosa
Detail engineering, Pacific Biomass boiler project, CMPC Celulosa
Detail engineering, O2 Deling and Ncg & Ncg Laja, CMPC Celulosa
Conduciton of tailings, Los Peleambre mine
Basic engineering, Peripheral workshop, Chuquicamata South Mine
Detail engineering, handling optimization of Pebbles A2 concentrator
Conceptual engineering, Residual solids landfill, Ind. Plta Pacific 2, Cmpc
Basic engineering, PDA phase I, Andina
Esso Earth moving, maritime terminal Pargua
Devil Regiment Project Phase II, El teniente
Detail engineering, Ffcc Wheel reprofiling – Tte8, El Teniente
Conceptual Engineering, crossing extension of L1 underpass, Metro Manquehue
Basic engineering, Line 1 East, Metro
Detail engineering, interconnections/Junction La Farfana-Mopocho, Aguas Andina
Detail enginering, Pureo Plant Calbuco, X Region, Codelco
Detail engineering, Section 0 Quinta Normal-General Velásquez, Metro Santiago de Chile
Detail engineering, Section 1 Quinta Normal-Lo Prado, Metro Santiago de Chile
Basic engineering, Dock Bridge passing Marino San Vicente Terminal, Enap
Basic engineering, standardization of medium voltage cells, Miraflores and Quinteros, Chilquinta
Detailed land engineering Mauro reservoir, Los Pelambres Mine
Basic engineering, standardizing switchyards 110kv and 12kv S/E San Antonio, Chilquinta
Cmpc Laja and Santa Fe Upgrade
Truck workshop Collahuasi
Pre-feasibility and feasibility Maricunga
BEPCM Rio Elqui